ZETLAN TECHNOLOGIES
Course Categories 172+
Cloud & Infrastructure 7
Networking 8
Virtualisation 5
IT Security 10
CyberSecurity & Mgmt 14
Software Development 16
Web Dev & Database 27
Data Science & AI 14
Mobile, Testing & Games 22
Design & Creative 49
Navigation
Home Business About Us Contact Us All Courses FAQ & Help
Contact Us
+91 8680961847 +91 8680961847 (WhatsApp) info@zetlantechnologies.com
Browse by Domain
Cloud & Infrastructure 7
Networking 8
Virtualisation 5
IT Security 10
CyberSecurity & Mgmt 14
Software Development 16
Web Dev & Database 27
Data Science & AI 14
Mobile, Testing & Games 22
Design & Creative 49
2000+ Courses · 15+ Technology Domains
Microsoft Cisco AWS EC-Council View All Courses
PM-IN-2023
/ Dell Certifications / PM-IN-2023
Dell Proven Professional · Install · PM-IN-2023

Dell PowerMax

Install

Master Dell PowerMax installation — family concepts and features, PowerMaxOS 10 hardware, PowerMaxOS 10 installation procedures, and PowerMax 2000/8000 installation and upgrade in enterprise storage environments.

PowerMax 2000 PowerMax 8000 PowerMaxOS 10 NVMe SCM iSCSI/FC SRDF Replication CloudIQ Unisphere eNAS TimeFinder Direct Matrix Online Expansion
Enroll Now Brochure
PM-IN-2023 — PowerMax Install Architecture
PowerMax Install — PM-IN-2023 Four-Module Architecture Family Concepts HW Concepts OS10 Install 2000/8000 Install PowerMax 2000/8000NVMe + SCM tiersSRDF/TimeFinderCloudIQ + UnisphereeNAS integrationDirect Matrix arch.NVMe flash baysSCM storage classCooling + power req.Data at Rest Encrypt.OS10 install prepSE toolkit installLicense activationInitial UnispherePost-install checks2000/8000 rack kitCabinet cablingOnline expansionNon-disruptive upgrdHealth validation PowerMax Platform Engine (Storage Processor) · NVMe/SCM bays · Direct Matrix interconnect · SAN (FC/iSCSI/NVMe-oF) · Unisphere management Storage Tiers NVMe Flash (eFlash) — primary tierStorage Class Memory (SCM) — ultra-latencyAutomated tiering: FAST.VP per LUNData reduction: dedup + compress Replication SRDF/S — sync replication (0 RPO)SRDF/A — async replicationTimeFinder/Snap V2 — local snapseRDF — cloud-based replication Management Unisphere for PowerMax (GUI)REST API (v10) for automationCloudIQ predictive analyticsVMAX ESRS remote support PM-IN-2023 — Dell PowerMax Install Certification Module Coverage Family Concepts HW Concepts OS10 Install 2000/8000 Install
4
Modules
Full PM-IN-2023 scope
25+ hrs
Duration
Install-level training
Install
Level
Hands-on install
24/7
Support
Expert guidance
Exam At a Glance
🧪
PM-IN-2023
Exam Code
PowerMax Install
🌐
English
Language
English only
🔧
Install
Level
Install level
🏅
Dell Proven
Credential
Professional cert
🔄
2 Years
Validity
Recertify required
None
Pre-req
No formal prerequisites
What You Will Learn

Four PowerMax Install Modules

Family concepts, PowerMaxOS 10 hardware, PowerMaxOS 10 installation, and PowerMax 2000/8000 installation and upgrade — complete PowerMax installation expertise.

Module 01
PowerMax Family Concepts and Features
  • PowerMax product family — PowerMax 2000 and 8000 models: target workloads, capacity ranges, performance characteristics; positioning vs. PowerStore, Unity XT, and VMAX 950F; PowerMax as the successor to VMAX all-flash
  • PowerMaxOS 10 features overview — NVMe-native architecture; Storage Class Memory (SCM) as a persistent tier; inline data reduction (deduplication and compression); SRDF replication enhancements in OS10
  • NVMe architecture — NVMe over Fibre Channel (NVMe-oF FC); NVMe over TCP; NVMe namespace vs. LUN provisioning; host NVMe HBA configuration; NVMe performance advantages over FC SCSI
  • SRDF (Symmetrix Remote Data Facility) — SRDF/S synchronous (RPO=0), SRDF/A asynchronous, SRDF/Metro (active/active); SRDF in PowerMaxOS 10: delta set extension (DSE) improvements; SRDF consistency groups
  • TimeFinder — TimeFinder/Snap V2: space-efficient snapshots; TimeFinder/Clone: full volume clone; TimeFinder/VP Snap: virtual provisioning snaps; use cases for backup, test/dev, reporting
  • CloudIQ and Unisphere — CloudIQ predictive analytics: health scoring, performance anomaly detection, capacity planning; Unisphere for PowerMax: GUI, REST API; eNAS (embedded NAS) integration in PowerMax 2000/8000
Module 02
PowerMaxOS 10 Hardware Concepts
  • PowerMax engine architecture — PowerMax Engine as the storage processor: Front-End Directors (FE), Back-End Directors (BE), Remote Access Directors (RA), Host Interface Directors; Director redundancy and failover behavior
  • Direct Matrix interconnect — Direct Matrix architecture: full any-to-any director connectivity without a crossbar switch; bandwidth and latency advantages; Director-to-Director communication paths; NUMA considerations in engine design
  • NVMe flash bay hardware — NVMe flash bay component: NVMe SSD types (eMLC, 3D NAND), bay dimensions, maximum drives per bay, hot-plug capability; drive slot numbering and bay mapping in Unisphere
  • Storage Class Memory (SCM) hardware — SCM technology: Optane/SCM as an NVMe-protocol persistent memory tier; SCM performance characteristics (sub-100µs latency); SCM bay hardware; SCM integration with FAST.VP automated tiering
  • Data at Rest Encryption (D@RE) — D@RE in PowerMax: self-encrypting drives (SEDs); external key management (EKM) with Dell Key Manager or Gemalto SafeNet; key management procedures; D@RE compliance implications
  • Power, cooling, and cabling — PowerMax cabinet power requirements (kVA); cooling specifications (BTU/hr); floor load weight; data center site survey checklist; front-end (SAN) and back-end (internal) cabling overview
Module 03
PowerMaxOS 10 Install
  • Pre-install preparation — PowerMax configuration worksheet: system name, IP addresses, DNS, NTP, licensing; SE toolkit (Solutions Enabler) version compatibility; Unisphere version requirements; customer site prerequisites checklist
  • SE Toolkit installation — Solutions Enabler deployment: installing SE on a management host; SE CLI (symcli) basic commands; SE database initialization; Solutions Enabler API gateway for REST access; SYMAPI license verification
  • PowerMaxOS 10 install procedure — factory pre-loaded OS vs. field install scenarios; connecting to PowerMax Console Port; initial configuration wizard: system name, management IP, NTP, DNS, VLAN; verify engine-to-engine communication
  • License activation — license file installation via Unisphere: import .dat license file; per-feature license verification (SRDF, TimeFinder, CloudIQ, eNAS); license alert thresholds; trial license and permanent license management
  • Initial Unisphere configuration — Unisphere GUI first login: change default credentials; enable ESRS (Embedded Service Reporting) for remote support; register with CloudIQ; configure alert notifications (email/SNMP); user and role management
  • Post-installation validation — running system health check via Unisphere: verify all directors green; check back-end connectivity; verify NVMe flash bay recognition; FAST.VP policy default; create test TDEV and map to host for connectivity validation
Module 04
PowerMax Installation and Upgrade (2000/8000)
  • PowerMax 2000 installation — PowerMax 2000 physical install: 2U engine in rack; cabinet kit or customer rack; front-end director port cabling (FC/iSCSI/NVMe-oF); back-end cabling to NVMe bays; management LAN connection; power-on sequence
  • PowerMax 8000 installation — PowerMax 8000 multi-engine system: V-Brick (cabinet) containing engines + bays; rack and stack procedure; inter-engine Direct Matrix cabling (internal V-Brick cables); SAN cabling for FE directors; mechanical layout
  • Cabinet and cabling procedures — using PowerMax Rack Configuration Tool for cable planning; SolVe Online procedures for specific models; labeling conventions; torque specifications for rack fasteners; anti-tip precautions for heavy cabinets
  • Online expansion (non-disruptive) — adding NVMe flash bays online: bay insertion sequence; SolVe procedure for bay add; Unisphere bay discovery and acceptance; non-disruptive data rebalancing across new bays; FAST.VP policy update after expansion
  • PowerMaxOS upgrade procedure — non-disruptive Codeload upgrade (NDU): pre-upgrade health check; upgrade planning using Unisphere upgrade wizard; staged codeload activation per director; rollback procedure; post-upgrade validation checklist
  • PowerMax hardware upgrade — adding engines to PowerMax 8000: Direct Matrix cable expansion; Unisphere cluster expansion workflow; performance verification after engine add; adding Front-End Directors to existing engine: director slot, cabling, zoning; Unisphere director enable procedure
Technologies You Will Master
PowerMax 2000
PowerMax 8000
PowerMaxOS 10
NVMe Flash
SCM Tier
Direct Matrix
SRDF/S & SRDF/A
TimeFinder Snap
Unisphere GUI
Solutions Enabler
CloudIQ
eNAS
D@RE Encryption
FAST.VP
NVMe-oF FC
Online Expansion
PowerMax 2000
PowerMax 8000
PowerMaxOS 10
NVMe Flash
SCM Tier
Direct Matrix
SRDF/S & SRDF/A
TimeFinder Snap
Unisphere GUI
Solutions Enabler
CloudIQ
eNAS
D@RE Encryption
FAST.VP
NVMe-oF FC
Online Expansion
Full Curriculum

4-Module PM-IN-2023 Programme

  • PowerMax 2000/8000 positioning; PowerMaxOS 10 NVMe-native architecture overview
  • SRDF/S, SRDF/A, SRDF/Metro; TimeFinder/Snap V2 + Clone; DSE improvements
  • NVMe-oF FC/TCP; NVMe namespace vs LUN; host HBA config; perf advantages
  • CloudIQ predictive analytics; Unisphere REST API; eNAS integration
  • Engine architecture: FE/BE/RA/Host directors; Direct Matrix (any-to-any) design
  • NVMe flash bays: SSD types, hot-plug, bay mapping; NUMA director considerations
  • SCM (Optane/SCM tier): sub-100µs latency; FAST.VP automated tiering integration
  • D@RE: SED drives, EKM (Dell Key Manager/SafeNet); power/cooling/weight site reqs
  • Pre-install: config worksheet, SE toolkit, Unisphere compat, site prerequisites
  • SE installation: symcli init, SE API gateway, SYMAPI license verification
  • OS10 install: console port config wizard; name, mgmt IP, NTP, DNS; engine comms
  • Licensing: .dat import, per-feature check, ESRS, CloudIQ; post-install health check
  • PM2000 rack: 2U engine, FE/BE cabling, mgmt LAN, power-on sequence
  • PM8000 multi-engine: V-Brick, Direct Matrix inter-engine, FE SAN cabling
  • Online NVMe bay expansion (non-disruptive): SolVe procedure, FAST.VP update
  • NDU codeload upgrade: pre-check, staged director activation, rollback, validation
Live Training
Live Instructor
Mon–Fri · Weekend batches
Recording
Live class recording included
30 Days
1.5 hrs/day weekday · 3 hrs weekend
Course Materials
Study notes and resources
Tech Support
Call / WhatsApp support
Working Hours
Mon–Fri · 9 AM – 6 PM
Enroll Now Download Brochure
Have Questions?

Chat with our Dell PowerMax-certified trainers instantly.

WhatsApp Us
New Batch Starting Soon — Limited Seats

Ready to Install Dell PowerMax?

Earn the PM-IN-2023 Dell Proven Professional certification and validate your hands-on expertise in installing, configuring, and upgrading Dell PowerMax 2000 and 8000 enterprise storage systems.

Enroll Now Call Us WhatsApp
Zetlan Technologies
Online — Replies in minutes
👋 Hi! Welcome to Zetlan Technologies.

Interested in Dell PowerMax Install PM-IN-2023? Ask us anything!
Just now
Course Details Batch Schedule Free Demo
Open WhatsApp Chat
💬 Chat with us!